Our story

From a coral-stone house in Deira to four addresses across Dubai

  1. 1961

    Shaded terrace of a coral-stone house overlooking Dubai Creek

    The first house, Deira

    Saeed bin Rashid Al Mehairi builds his family home from coral stone and gypsum near the creek, around a courtyard with a neem tree.

  2. 1988

    Coral-stone house with a carved door beside Dubai Creek

    The Al Wasl houses

    His son Khalid builds twelve courtyard houses in Al Wasl. Eleven are still lived in by the families who bought them.

  3. 2026

    Tawd Bay Residences, sea-front villa on Jumeirah Bay Island

    The third generation

    Rashid and Hessa Al Mehairi lead TAWD into Jumeirah Bay, Palm Jumeirah and Al Barari — with the same stone, and the same promise.

A letter from our chairman

My grandfather built with his hands. We still do

In 1961 my grandfather, Saeed bin Rashid Al Mehairi, built his first house in Deira from coral stone he carried from the creek. He built it for his own family, and three generations of us grew up in its courtyard.

Everything we have built since has been measured against that house. Would we live in it? Would our children want to inherit it?

We still build fewer homes than we could, we still cut our stone by hand, and we still hand over every key on the date we promised.

Rashid Al Mehairi

Rashid Al Mehairi

Chairman, third generation

Courtyard house seen from above with a central pool
Deira courtyard, 1961
Door knocker, Al Wasl
Al Wasl, 1988
Brass lattice
Al Safa, 2025

Why TAWD

  1. 01Three generations of building in the Gulf

    One family, one name on every handover since 1961.

  2. 02Every home delivered on time

    214 projects, not one late handover.

  3. 03One family, no shortcuts

    Hand-cut stone, solid timber, lime plaster — never the cheaper substitute.

  4. 04Aftercare for life, not for a year

    Our own maintenance team looks after every TAWD home we have built.

Hand-dressed limestone surface
Stone lounger under lattice shadows
Oiled walnut door with a brass pull and lime plaster

Promises kept

The site ledger

Every handover since 1961 is recorded by hand in the same series of ledgers. A few pages:

The site ledger
ProjectPromisedDelivered✓
Al Mehairi House, DeiraNov 1961Oct 1961
Al Wasl CourtyardsMar 1988Feb 1988
Tawd Tower, DeiraDec 1996Dec 1996
Umm Suqeim VillasJun 2009May 2009
Tawd Courtyard Villas, Al SafaSep 2025Aug 2025

Meet the family

Come and see how we build

Visit the sales gallery, or join a guided site walk at Tawd Grove on Saturday mornings.

Woven chair against terracotta lime plaster